CAMPAIGNS
POST CONTEST
Twenty-five posts win $10 of tokens each. Introduce the herd, quote the pinned post, and tag @arcticanimalss. A hashtag is not required.
ENDS IN
48:00:00
The contest ends in 48 hours. After the winners are announced on this page, $10 of tokens is sent to each winning wallet.
The highest scores. One prize per wallet.
Sent to each winning wallet after the winners are announced on this page.
The post must stay live for at least 12 hours. Do not delete it.
HOW TO ENTER
- Write the post in your own words. Introduce Arctic Animals: hold $5 of $ARCTIC, send mint 0x… on Fomo, and the herd on Arc mainnet. A hashtag is not required.
- Quote the pinned post on @arcticanimalss.
- Tag @arcticanimalss in the post.
- Attach one of the four images below. Put your full Fomo EVM address in the post, or in the image description: 0x and 40 hex characters. Either place is enough. That address is compared with the wallet you send on this page.
- Leave the post up for at least 12 hours. Do not delete it.
- Send the post link and the same wallet in the form. One wallet, one post. Sending again replaces the link.
THE SCORE
(likes + comments × 10 + reposts) / views = post points
The 25 highest scores win. A post with no views scores zero.
IMAGE DESCRIPTION
Put your full Fomo wallet in the post text, or in this image description field. Either one is enough. In the example, replace (your evm address) with your own 0x address. We compare that address with the wallet you send on this page.
ONE BLOKYZ. FIRST 500.
A thank-you draw for the opening batch. One account among the first 500 that complete the $5 buy in the pinned post receives Blokyz #3519 after the raffle.
THE PRIZE ON DISPLAY
Blokyz #3519 is the piece set aside for this campaign. It was chosen because it already belongs to the same cold age as the herd: fur, a stone block, camp rations against the frost. It lives on Ethereum and stays on this page until it is gifted to the winner.
Contract 0x86ffb7988913e85a5a07d459a5165ab1273cfe62
A single wallet receives the Blokyz. No split, no second prize.
The draw is the first 500 accounts that complete the $5 buy in the pinned post.
Gifted after the raffle. The token is not a mint fee and not part of the ARC herd.
THANK YOU, @TMA_420
This campaign is held in honor of @Tma_420 taking part. Thank you for the support you give to new projects entering the ecosystem.
The note lives with the post that marked the moment: Arctic Animals on X.
HOW THE DRAW WORKS
- Entry is the first 500 accounts that complete the $5 buy in the pinned post. A later buyer is not in this pool.
- One winner is drawn from that pool.
- Blokyz #3519 is gifted to that wallet after the raffle.
- There is no extra form and no wallet connect on this page.